Deck Design & Permit Drawings
Scaled site, framing and elevation drawings for an Ottawa deck permit, drawn by a designer or by you under the homeowner design exemption.
Vendor estimates read in September 2026 from three drafting and design firms. One drafting firm lists engineering separately. The City permit fee is separate.
Find a Deck BuilderAbout Deck Design & Permit Drawings
An Ottawa deck permit application needs a completed and signed digital application, a complete set of scaled and fully dimensioned drawings, and Schedule 1 naming who took design responsibility: a BCIN designer, an architect, an engineer, or the homeowner. The City explains that the Building Code lets a homeowner take design responsibility for a house they own; the exemption does not cover estates, tenants or numbered companies, or a building with more than two dwelling units.
The drawings the City lists are a site plan (the deck dimensioned to buildings, property lines and any septic system), a foundation and framing plan (footings or helical piles, joists, beams, posts, decking sizes and spans, the connection to the house, and stairs), and elevations (the height of the walking surface above grade, footing depth, stair rise and run, and guards). Decking other than conventional lumber needs a CCMC or BMEC material report.
Zoning decides where the deck may go. For applications complete on or after March 11, 2026, Ottawa applies both Zoning By-law 2008-250 and the new By-law 2026-50, with the most restrictive provisions applying, and some parts of 2026-50 are still under appeal, so confirm the current rules with the City. The permit fee is $12.75 per $1,000 of construction value, $117 minimum. Published prices for deck permit drawings run roughly $399 to $2,500.
What This Work Covers
- Site plan, foundation and framing plan, and elevations
- Schedule 1 by a BCIN designer, architect, engineer or homeowner
- CCMC or BMEC report for composite and PVC boards
- Zoning checked against both by-laws
- Permit applied for through My ServiceOttawa
Popular For
What this work costs
Common questions about deck design & permit drawings
- Deck permit when the house has three units in Ottawa?
- Does a replacement deck in Orleans need new drawings?
- How long is the first permit review for an Ottawa deck?
- What do permit drawings for a deck cost in Nepean?
- How does Ottawa calculate the building permit fee for a deck?
- Who applies for the Ottawa deck permit, me or my builder?
- Does my septic system affect where an Ottawa deck can go?
- PVC or composite decking: which costs more for an Ottawa build?
Other Deck Services
New Deck Building
A new pressure-treated or cedar deck for an Ottawa home, from footings and framing to boards, guards and stairs, built to the 2024 Ontario Building Code.
Composite & PVC Decks
Decks surfaced with composite or cellular PVC boards. Ottawa asks for a CCMC or BMEC material report when the decking is not conventional lumber.
Deck Replacement & Removal
Tearing out a worn deck and building its replacement, including taking the old lumber to Trail Road or another landfill.
Deck Repair & Resurfacing
New boards on sound framing, loose guards and stairs fixed, and a fresh penetrating finish on a wood deck.
Deck Railings & Guards
Wood, aluminum and glass guards to Ontario rules: 900 mm or 1 070 mm high, openings under 100 mm, nothing climbable between 140 mm and 900 mm.
Deck Stairs
Deck stairs and landings to Ontario limits: rise 125 mm to 200 mm, run 255 mm to 355 mm, and a handrail once there are more than 3 risers.
Deck Footings & Helical Piles
Concrete footings or helical piles under a deck, including the engineered design Ontario requires on Leda clay and for deep foundations.