Free Deck Builder Matching Decks, Railings, Stairs & Footings Decks Across Ottawa
Find a Contractor

Deck Footings & Helical Piles

Concrete footings or helical piles under a deck, including the engineered design Ontario requires on Leda clay and for deep foundations.

Few published Ottawa prices: get written quotes Utility locates can take up to 5 business days. Ask for the foundation schedule in writing.

Too few published Ottawa footing and pile prices to quote a range. Ask what foundation each quote uses and whether engineering is included.

Find a Deck Builder

About Deck Footings & Helical Piles

For deck foundations with no heated space in clay or soils not clearly defined, the Building Code table sets a depth of 1.2 m, but not less than the depth of frost penetration, and Ontario says frost depth is established on the basis of local experience. We found no City of Ottawa page that sets one frost depth for decks, so ask the builder and your permit reviewer what depth your drawings show and why.

Some decks are exempt from those depths: a deck of not more than 1 storey and not more than 55 square metres, with no more than 600 mm from finished ground to the underside of the joists, not supporting a roof, and not attached to another structure unless it can be shown that differential movement will not adversely affect that structure. All five conditions have to hold.

Ontario adds two rules that matter here. Where a foundation is on filled ground, peat or sensitive clay, including Leda clay, the footing sizes must be designed under Section 4.2 of the Code, and deep foundations also go to Section 4.2 design. The City's permit list includes a helical pile layout and specifications where piles are used. Before anyone digs, Ontario law says the excavator, which includes a homeowner digging their own holes, must request a free locate through Ontario One Call; members have 5 business days to respond. Too few published Ottawa footing prices exist to quote a range.

What This Work Covers

  • Concrete footings and piers sized on the permit drawings
  • Helical piles with layout and specifications for the City
  • Section 4.2 engineered design on Leda clay, peat or fill
  • The five-condition floating-deck exemption, checked honestly
  • Ontario One Call locates before any digging

Ready to Get Started?

Tell us about your deck footings & helical piles job and we'll send it to local deck builders in Ottawa. They reply by email.

Find a Deck Builder